All projects

Residential case study

Mt Victoria floor-console rough-in & high-wall split installation

Mt Victoria, NSW 2786 · Blue Mountains

A look behind the walls and at the installation: floor-console rough-in, indoor-unit fitting and a Daikin high-wall split, with real photos from our Mt Victoria job.

Daikin high-wall split-system indoor unit fitted during building work at Mt Victoria

The job: rough-in through to indoor-unit installation

Betar Air completed floor-console rough-in and a high-wall split installation at this Mt Victoria property. The work took place alongside ongoing building work, with access to the exposed framing before wall lining and indoor units fitted as the rooms progressed.

Floor-console rough-in

The floor-console rough-in was completed while the timber wall framing was still exposed. Our photos show the preparation and cabling within the insulated framing before the walls were closed, followed by the console during fitting with its front cover removed.

The console was protected while building work continued around it, as shown in the installation-stage photos below.

Daikin high-wall split installation

We installed the Daikin high-wall split-system indoor unit on the lined wall. Front and side views show its position and the indoor-unit fitting while building work continued around it.

The exterior photos also document two Daikin outdoor units beside the property, bringing the indoor and outdoor stages of this Mt Victoria job together in one case study.

Recent Mt Victoria project: floor console and high-wall split

Floor-console rough-in and high-wall split-system work at a Mt Victoria property. These project photos show the preparation within exposed framing, indoor-unit fitting during ongoing building work, and two Daikin outdoor units.

Room with exposed framing and rough-in cabling at the Mt Victoria air conditioning project
Room preparation and rough-in before wall lining
Insulated wall framing with rough-in cabling at the Mt Victoria project
Rough-in within the insulated wall framing
Rough-in wiring and exposed timber framing before wall lining at Mt Victoria
Wall framing and rough-in detail
Corner of the insulated room showing exposed framing during the Mt Victoria rough-in stage
Rough-in stage before the walls are closed
Floor-console air conditioner with its front cover removed during installation at Mt Victoria
Floor console with front cover removed during fitting
Floor-console air conditioner covered in protective wrapping beside a glazed door at Mt Victoria
Floor console protected during ongoing building work
Two Daikin outdoor air conditioning units positioned beside the Mt Victoria property
Two Daikin outdoor units
Person wearing a Betar Air polo beside the two Daikin outdoor units at the Mt Victoria project
Betar Air on site at Mt Victoria
Daikin high-wall split-system indoor unit fitted during building work at Mt Victoria
Daikin high-wall split system fitted to the lined wall
Side view of the Daikin high-wall split-system indoor unit at the Mt Victoria project
High-wall split-system side view